AE: FTQW 221012 - Repair Waste Water Treatment SCADA System
Agency: | |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159008856378446 |
Posted Date: | Mar 12, 2024 |
Due Date: | Mar 20, 2024 |
Source: | https://sam.gov/opp/714d42d7e9... |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Updated)
- All Dates/Times are: (UTC-08:00) ANCHORAGE, ALASKA, USA
- Updated Published Date: Mar 12, 2024 12:42 pm AKDT
- Original Published Date: Feb 23, 2024 11:15 am AKST
- Updated Response Date: Mar 20, 2024 02:00 pm AKDT
- Original Response Date: Mar 12, 2024 01:00 pm AKDT
- Inactive Policy: 15 days after response date
- Updated Inactive Date: Apr 04, 2024
- Original Inactive Date: Mar 27, 2024
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: C219 - ARCHITECT AND ENGINEERING- GENERAL: OTHER
-
NAICS Code:
- 541330 - Engineering Services
-
Place of Performance:
Eielson AFB , AK 99702USA
Q&A:
- Can you clarify the scope required for the Geotechnical Engineer? The described scope of work does not seem to require this discipline.
For clarification there will be no requirement to have Geotechnical Engineers on the Team Composition.
- Can you confirm whether a “SE” license is required for the Structural Engineer? For this type of facility a Civil Engineer “CE” seems allowable.
For Clarification there will also be no Structural Engineeer on the Team Composition and that is correct a Civil Engineer is allowable.
- Are Existing P&ID drawings available for the plant?
There are no existing P&ID drawings for the plant.
- Will the project modify any of the existing WWTP processes?
This project will not modify existing processes
- Will new P&ID drawings be required in the design deliverables?
It states in Section 1.03 C of the SOW that a new P&IDs are required.
- Does the project include ADEC permitting?
Since the poject doesn't involve changes to the plant's discharges, it shouldn't require any amendments to Eielson's permit.
- is there a page limit for Section H of the response?
For section H of the response the maximum amount of pages is 10.
RPR WWTP SCADA - FTQW 221012
Notice to Offeror(s)/Supplier(s):
Funds are not presently available for this effort. No award will be made under this pre-solicitation until funds are available. The Government reserves the right to cancel this notice, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
This notice is a solicitation for Architect and Engineering services to be performed on Eielson AFB, Alaska. Please refer to the attached Project Attachments for further instructions/details.
Please be sure to email both the Primary and Secondary POC's for any questions(As directed above)/ SF 330 submissions (General Information)**
- ADMIN ONLY NO REQTN CP 907 377 5207 2310 CENTRAL AVE STE 3
- EIELSON AFB , AK 99702-2200
- USA
- Camden Chan
- camden.chan@us.af.mil
- Phone Number 9073773485
- Elias Campos
- elias.campos.1@us.af.mil
- Phone Number 9073773567
- Mar 12, 2024 12:42 pm AKDTPresolicitation (Updated)
- Feb 23, 2024 11:15 am AKST Presolicitation (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.