Kenai Lake Work Center Water/Wastewater System Improvements
Active
Contract Opportunity
Notice ID
1240BJ23R0004
Related Notice
Department/Ind. Agency
AGRICULTURE, DEPARTMENT OF
Sub-tier
FOREST SERVICE
Office
USDA-FS, CSA NORTHWEST 7
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information
  • Contract Opportunity Type: Presolicitation (Original)
  • All Dates/Times are: (UTC-08:00) PACIFIC STANDARD TIME, LOS ANGELES, USA
  • Original Published Date: Feb 24, 2023 01:54 pm PST
  • Original Response Date: Mar 13, 2023 04:30 pm PDT
  • Inactive Policy: 15 days after response date
  • Original Inactive Date:
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1NE - CONSTRUCTION OF WATER SUPPLY FACILITIES
  • NAICS Code:
    • 237110 - Water and Sewer Line and Related Structures Construction
  • Place of Performance:
    Seward , AK 99664
    USA
Description

This is a 15 day Presolicitation that will close on Monday March 13, 2023 by 4:30pm pst. The Soliciation package will be posted on or soon there after. This project will have a Pre-Bid Site visit that contractors are strongly encouraged to attend. The exact date of the Pre-Bid visit will be within the posted solicitation.



The government estimate for this project is between: $1,500,000 - $3,000,000



The estimated period of performance for this project is: 5/1/2023 - 10/31/2024



Project Name: Kenai Lake Work Center Water & Wastewater System Improvements



Description



SUMMARY

A. This project is located at the Kenai Lake Work Center (KLWC). The address is Mile 24

Seward Highway, Seward AK 99664, on the West side of the highway. The KLWC is

located approximately 6 miles south of Moose Pass, Alaska.

B. Project Summary Description: The following descriptions are provided as an outline of

major work items, and shall not be constructed as an inclusive or complete listing of all

items of Work under this Contract.

1. Base Bid includes the following:

a) Utility improvements which include (1) hazardous abatement of the existing

crew house building; (2) Site demolition; (3) Site preparation; (4) Site

Mechanical which includes utilities improvements of the existing water

distribution system, installing a new sewer collection system and

appurtenances, and installing a new wastewater treatment system and

appurtenances; (5) and site electrical which includes the improvements to the

new wastewater treatment system per the plans and specifications.

1.2 GENERAL SITE CONDITIONS AND WEATHER

A. The elevation of the site is approximately 450 feet above mean sea level. The

construction site experiences heavy snowfall and cold temperatures (sometimes

extreme), with snow on the ground typically from October through May. Precipitation

averages 64 inches per year, with average total snowfall of 75 inches per year, as

provided by www.weather-us.com.

1.3 USE OF PREMISES

A. General: Contractor shall have limited use of premises for construction operations,

including use of Project Site, during construction period. Contractor's use of premises

is limited by the Government's right to perform work at the site. The KLWC office is

open year-round and several full-time staff occupy the premise. Seasonal staff arrive

intermittently throughout the year occupying the residences on the jobsite.

B. Contractor shall at all times conduct his operations to ensure the least inconvenience to

the public and employees.

C. Confine storage of materials to areas as approved by the CO.



D. Contractor shall provide adequate signing and barricades and take necessary safety

measures to protect the public during all construction operations. Contractor shall

minimize disturbance of all undisturbed areas.

E. Preservation of Natural Features: Confine all operations to work limits of the project.

Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing

damaged trees and plants, at no additional expense to the Government.

F. Provide temporary barriers to protect existing trees and plants and root zones.

1. Do not remove, injure, or destroy trees or other plants without prior approval.

Consult with CO and remove agreed-on roots and branches that interfere with

construction.

2. Do not fasten ropes, cables, or guys to existing trees.

3. Carefully supervise excavating, grading, filling, and other construction operations

near trees to prevent damage.

G. Existing Utilities: Notify CO of proposed locations and times for excavation.

1. Contractor shall be responsible for locating and preventing damage to known

utilities. If damage occurs, repair utility at no additional expense to the

Government.

2. Interruption of Existing Utility Service: Notify CO, 48 hours in advance of any

interruption of existing utilities.

1.4 MEALS AND LODGING

A. Meals and lodging are commercially available in Seward, AK, within 25 miles of the

construction site. Meals will not be available at Forest Service facilities. Camping at

nearby campgrounds may be allowed if approved.

1.5 CAMPING

A. Camping is not allowed at the construction site. Permission may be granted to camp at

a nearby location.

1.6 FIELD VERIFICATION

A. Field verify all new and existing dimensions affecting the work of this contract before

ordering products

1.7 REQUIREMENTS OF THE OFFERER’S PROPOSAL

A. The Government Drawings and Specifications are the basis for this Contract.

B. The work shall conform to the Drawings as closely as possible. Those products listed in

the Specifications are preferred products, chosen for compatibility, longevity, durability

and quality. However, equal or better alternatives submitted by the Offerer will be

considered.



1.8 PERMITTING

A. The Contractor shall be responsible for obtaining all permits and associated fees

required to complete the project.

B. Government-furnished permits/approvals include approval from the Alaska Department

of Environmental Conservation (ADEC) for public water and wastewater installation.

C. All electrical permit and inspection is to be by the local AHJ.








Attachments/Links
No attachments or links have been added to this opportunity.
Contact Information
Contracting Office Address
  • 1220 SW 3RD AVE
  • Portland , OR 972042829
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Feb 24, 2023 01:54 pm PSTPresolicitation (Original)

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >